I worked in building a prototype grabber that Eddie designed. Last Saturday I helped move the field to the library. Then I fixed some tubes that were deflated in the matches. Friday 22 I also helped take the field again so the drivers can practice the high peg and a more spacious field. Some of the parts of the field were missing so I had to made new ones. They were the bottom pegs. When I was doing them I had to cut a circle with the circular saw, I got to use the most expensive and strongest drill we have in the robotics room, the Hitachi.
No comments:
Post a Comment